Doha Urban Pipeline Relocation

 

 

  • Detailed engineering and procurement of long lead items
  • The development of Doha city is constrained by existing Gas Distribution System pipelines owned and operated by Qatar Petroleum
  • Re-route a portion of multi product pipeline and hook it up with the existing pipeline without disruption of flow by hot tapping
  • Improve the availability of gas to the receiving stations around Doha by 36" pipelines of 84 km and 8" pipeline of 3 km, and 12" pipeline of 12 km
  • Microtunnelling of 5 road crossings in hard rock
  • Very stringent safety, quality and environmental standards
  • Modifications of existing 5 stations
  • Upgrading the existing and installation of new telecom network including design of fiber optic communication network
  • De-commission and abandon the existing gas and oil lines of approx 140 km and 6 stations in a safe and environment friendly manner
  • Project completed in December 2010

 

 