Punj Lloyd builds 1.2 MWp solar rooftop power plants in Chandigarh

Published Date: 
19 Jan 2015 (All day)
Upload Section
Upload Documents: 

Inauguration of 600MW (2X300 MW) capacity Haldia Thermal Power Plant of Haldia Energy Limited constructed by Punj Lloyd

Published Date: 
27 Nov 2014 (All day)
Upload Section
Upload Documents: 

New Manufacturing and Systems Integration Facility

Location: 
Malanpur, Gwalior, India
Owner: 
Punj Lloyd Ltd
  • Punj Lloyd has established a state of the art manufacturing and systems integration facility in Malanpur, near Gwalior, on 65 acres of land
  • The manufacturing facility uses top-quality machines, employing advanced production techniques including lean manufacturing

One of the largest facilities of its kind in the Indian Defence private sector, its capabilities include:

Achievements: 

The facility has achieved ISO 9001, 14001, OHSAS 18001 certification in a short span of time

Punj Lloyd wins contract to build 194 luxury villas in Kolkata

Published Date: 
29 Jul 2011 (All day)
Upload Section
Upload Documents: 

Punj Lloyd to build process facilities for a crude oil storage cavern

Published Date: 
27 Jul 2011 (All day)
Upload Section

Doha Urban Pipeline Relocation

Owner: 
Qatar Petroleum

 

 

Dahej-Vijaipur Pipeline

Owner: 
GAIL, India
  • 42” dia, 506 km gas piepline
  • The Pipeline crossed the main Narmada canal, 378 m by the HDD method
Achievements: 
  • Completed in a record time of 270 days
  • Automatic welding and ultrasonic testing for the first time in India on an onshore pipeline
  • 11.2 million safe man hours without lost time injury
  • Expert manpower mobilised from 11 countries
  • 15 km of lowering in one spread in a day
  • Equipment mobilisation in 40 days, with 109 sidebooms from 9 countries
  • 450 crossings of rivers, canals, roads and railway lines
  • 150 km welded during heavy monsoon
  • Worked in difficult weather conditions
  • Difficult terrain varying from black cotton soil to very hard weathered rocks
  • The pipeline was laid simultaneously in six spreads with our own equipment
  • On peak days, an average of 6 km of welding was done. Out of the total length welded, 150 km was done in peak monsoon
  • Project awarded in June 2003, completed in February 2004

East West Gas Pipeline

Location: 
India
Owner: 
Reliance Gas Transportation Infrastructure Ltd, India
  • 303 km x 48" dia with 8 MLV stations and 5 compressors stations 
  • 2 Tap-off stations and 7 river crossings
Achievements: 
  • Laying 222 km of pipeline in highly sensitive and volatile atmosphere
  • 2 km section of Bhivpuri Ghat with extremely steep slopes up to 70o
  • Used specialised technology of cable crane system for transporting pipe and equipment down slopes, as conventional method is not possible
  • Introduced 'Gabions and Renomatresses' for slope protection, uncommon for pipeline protection
  • Crossing of Tapi river by float and sink technique
  • 1.5 km crossing by HDD, the longest river crossing of 48" dia done in India
  • Anti Buoyancy calculations with float design & spacing
  • Awarded Greentech Safety Award for engineering sector
  • Project completed in June 2008

Melita-Tripoli Pipeline

Location: 
Libya
Owner: 
Sirte Oil Company, Libya
  • Construction of 34” dia, 98.4 km pipeline from Tripoli to Melita and 24” dia, 21 km branch pipeline to the Zawia power plant, gas pressure reducing, metering stations and a compressor station at Melita
  • Project to be completed in 22 months
  • Completion of 34” dia, 157 km El Khoms - Tripoli pipeline, extensive civil, mechanical, electrical and instrumentation work on the gas pressure reducing, metering & SV stations, compressor stations at Sidra & Wachkah, telecommunication and SCADA work